Q.

If 10 men working 7 hours a day dig a trench 147 m long, ____ men working 8 hours a day will dig a trench 168 m long (of the same breadth and depth as the first in the same number of days) .


see full answer

Start JEE / NEET / Foundation preparation at rupees 99/day !!

21% of IItians & 23% of AIIMS delhi doctors are from Sri Chaitanya institute !!
An Intiative by Sri Chaitanya

(Unlock A.I Detailed Solution for FREE)

Ready to Test Your Skills?

Check your Performance Today with our Free Mock Test used by Toppers!

Take Free Test

Detailed Solution

Concept: 10 men working 8 hours a day will dig a trench 168 m long. Assume that one man can dig a trench at a rate of x meters per hour.
For the other group of guys as well, this rate will be the same.
Using the knowledge that 10 men digging a 147-meter trench for 7 hours each day, find the value of x.
Find the necessary number of men, working 8 hours per day, to dig a 168 m trench using this value of x.
Here, it is not stated in the inquiry how many days the initial group of 10 men needed to dig the 147-meter trench. Let's say that they dug it in a single day.
Thus, the second group of workers will similarly need to dig a 168-meter trench in a single day. Given that both groups finish their task in the same number of days,
Let's now assume that each man can dig a trench x meters long per hour in a day.
∴ In one hour, 10 guys can dig a trench 10x meters long.
∴ They will dig a trench that is 70 meters long in 10 x 7 hours. ———- (1) As is well known, a 147 m long trench was dug by 10 men working 7 hours per day.
147m = 70x (from (1) )
⇒x=14770=2.1m
The output of each man's labor is thus: P = excavating a 2.1-meter-long trench each hour over the course of a day. ——————- (2)
The other group of men will produce the same amount of labor.
Let's now assume that 168 meters of trench must be dug in eight hours by x guys.
We are aware that one man can dig a trench 2.1 meters long in an hour.
A trench 2.1 meters long can be dug by one man in an hour.
They will dig a 16.8 meter long trench in 8 hours.
This number must match 168.
⇒16.8y=168⇒y=16816.8=10 males
Therefore, 10 men are required to dig a trench 168m long in 8hours a day.
Hence, the answer is 8 hours.
 
Watch 3-min video & get full concept clarity
score_test_img

Get Expert Academic Guidance – Connect with a Counselor Today!

whats app icon
If 10 men working 7 hours a day dig a trench 147 m long, ____ men working 8 hours a day will dig a trench 168 m long (of the same breadth and depth as the first in the same number of days) .