If 11 men can dig 6 3 4   m long trench in one day. How many men should be employed for digging 27 m long trench of the same type in one day?


see full answer

Your Exam Success, Personally Taken Care Of

1:1 expert mentors customize learning to your strength and weaknesses – so you score higher in school , IIT JEE and NEET entrance exams.
An Intiative by Sri Chaitanya

a

40

b

41

c

42

d

44 

answer is D.

(Unlock A.I Detailed Solution for FREE)

Best Courses for You

JEE

JEE

NEET

NEET

Foundation JEE

Foundation JEE

Foundation NEET

Foundation NEET

CBSE

CBSE

Detailed Solution

Given,
Number of men required to dig 6 3 4 m= 27 4 m  long trench = 11.  Let the number of men required to dig 27 m long trench be x.
Then,

Number of men

11

x

Length (in m)

274

27

We can clearly observe that, more the number of men, more the length of trench will dig.
Therefore, this is the case of direct proportion.
As this is the case of direct proportion, therefore the ratio will remain constant throughout the table that is,
11÷ 27 4 = x 27 11× 4 27 = x 27 44 27 = x 27   Cross multiplying,
44×27=27×x   Solving for x, x= 44×27 27 x=44   Hence, the number of men required to dig 27 m long trench is 44.
Therefore, option 4 is correct.
 
Watch 3-min video & get full concept clarity
score_test_img

courses

No courses found

Ready to Test Your Skills?

Check your Performance Today with our Free Mock Test used by Toppers!

Take Free Test

Get Expert Academic Guidance – Connect with a Counselor Today!

best study material, now at your finger tips!

  • promsvg

    live classes

  • promsvg

    progress tracking

  • promsvg

    24x7 mentored guidance

  • promsvg

    study plan analysis

download the app

gplay
mentor

Download the App

gplay
whats app icon
personalised 1:1 online tutoring