First slide
Work
Question

A bucket filled with water weighing 30kg is raised from a well of depth 10m. If the linear density of rope is 0.2kg per meter, the amount of work done is (g=10ms2)

Moderate
Solution

W=Wbucket +Wrope W=mbgh1+mrgh2W=30×10×10+(0.2×10)×10×102W=3000+100W=3100J

Get Instant Solutions
When in doubt download our app. Now available Google Play Store- Doubts App
Download Now
Doubts App