A bucket filled with water weighing 20 kg is slowly raised from a well of depth 20m. If the linear density of the rope is 0.2kg per meter, the amount of work done is, (g = 10m/s2)

a
4000J
b
4040J
c
4400J
d
4200J

detailed solution

Correct option is C

W=mgh+MgL2=20×10×20+4×10×202w = 4400 J