Download the app

Questions  

A particle of mass 100 g is thrown vertically upwards with a speed of 5 m/s. The work done by the force of gravity during the time the particle goes up is :

a
1.25 J
b
0.5 J
c
- 0.5 J
d
- 1.25 J

detailed solution

Correct option is D

Maximum height =u22g=(5)22(10)=1.25mWgravity = -mgh = -1.25J

Talk to our academic expert!

+91

Are you a Sri Chaitanya student?


Similar Questions

A bucket of mass ‘m’ tied to a light rope is lowered at a constant acceleration of ‘g/4’. If the bucket is lowered by a distance ‘d’, the work done by the rope will be (neglect the mass of the rope)


phone icon
whats app icon