The power (P) of an engine lifting a mass of 100 kg up to a height of 10m in 1 min is [J&K CET 2013)
163.3 W
9800 W
10000 W
5000 W
Power = Work done Time
Work done =mgh=100×9.8×10
Time = 1 min = 60 s
∴ P=100×9.8×1060=163.3 W