First slide
Constraints
Question

For the pulley system shown, each of the cables at A and B is given a velocity of 2 m/s in the direction of the arrow. Determine the upward velocity v of the load m.

Moderate
Solution

VA = 2 m/s   (towards right)

VP1 = VA2 =  1 m/s   (upwards)

VB = 2 m/s         (towards left)

Now 2Vp2 = VB+VP1

VP2 = VB+VP12 = 2+12 = 1.5 m/s

Get Instant Solutions
When in doubt download our app. Now available Google Play Store- Doubts App
Download Now
Doubts App