First slide
Work
Question

A uniform chain of length 2m is kept on a table, such that a length of 60 cm hangs freely from the edge of the table. The total mass of the chain is 4 kg.  What is the work done in pulling the entire chain on the table ?

Moderate
Solution

The center of gravity of the hanging part is at  0.3 m from table.


     mass of hanging part of chain  =   4×0.62  =   1.2kg
     Work done in pulling the entire chain on to the table=(mass of hanging part)g(center of gravity of hanging part)  =    mgh  =   1.2 x 10 x 0.3  =   3.6 J

h= height through which the centre of mass of the hanging part moved on pulling.
 

Get Instant Solutions
When in doubt download our app. Now available Google Play Store- Doubts App
Download Now
Doubts App