Banner 0
Banner 1
Banner 2
Banner 3
Banner 4
Banner 5
Banner 6
Banner 7
Banner 8
Banner 9
Banner 10
AI Mentor
Book Online Demo
Try Test

Quiz on Chenab Railway Bridge with Answers

By Brijesh Sharma

|

Updated on 29 Oct 2025, 14:20 IST

The Chenab Bridge GK is one of the most amazing topics to learn about in India’s modern engineering wonder. The Chenab Rail Bridge, standing over the Chenab River in Jammu and Kashmir, is the world’s highest 359 meters railway bridge, even taller than Eiffel Tower. This bridge shows how strong and smart Indian engineers are. The Chenab Railway Bridge inauguration date was June 6, 2025, when Prime Minister Narendra Modi officially opened it for train movements. The bridge connects remote areas and helps in travel, trade, and national security.

This gk quiz on Chenab Railway Bridge 2025 with answers will help students know more deep facts about this structure, like its height 359 meters from river, construction material, and how many years it will last. It is not only a GK Question topic but also a great sign of India’s growth and technology. This quiz on Chenab Railway Bridge 2025 will test your general knowledge and also make your learning more fun.

Fill out the form for expert academic guidance
+91
Student
Parent / Guardian
Teacher
submit
GK Quiz on Chenab Railway Bridge 2025 with Answers

Quiz on Chenab Railway Bridge 2025 with Answers 

Ques: Where is the Chenab Rail Bridge located?

(a) Himachal Pradesh

Unlock the full solution & master the concept
Get a detailed solution and exclusive access to our masterclass to ensure you never miss a concept

(b) Jammu and Kashmir

(c) Uttarakhand

Ready to Test Your Skills?
Check Your Performance Today with our Free Mock Tests used by Toppers!
Take Free Test

(d) Sikkim

Answer: (b) Jammu and Kashmir

cta3 image
create your own test
YOUR TOPIC, YOUR DIFFICULTY, YOUR PACE
start learning for free

Ques: Over which river is the Chenab Rail Bridge built?

(a) Ganga

Best Courses for You

JEE

JEE

NEET

NEET

Foundation JEE

Foundation JEE

Foundation NEET

Foundation NEET

CBSE

CBSE

(b) Jhelum

(c) Chenab

Ready to Test Your Skills?
Check Your Performance Today with our Free Mock Tests used by Toppers!
Take Free Test

(d) Beas

Answer: (c) Chenab

cta3 image
create your own test
YOUR TOPIC, YOUR DIFFICULTY, YOUR PACE
start learning for free

Ques: What is the total length of the Chenab Rail Bridge?

(a) 1,250 m

(b) 1,315 m

(c) 1,500 m

(d) 1,200 m

Answer: (b) 1,315 m

Ques: How high does the Chenab Railway Bridge stand above the river?

(a) 250 meters

(b) 300 meters

(c) 359 meters

(d) 400 meters

Answer: (c) 359 meters

Ques: What type of bridge is the Chenab Rail Bridge?

(a) Suspension Bridge

(b) Arch Bridge

(c) Beam Bridge

(d) Cable-Stayed Bridge

Answer: (b) Arch Bridge

Ques: When was the arch of the Chenab Rail Bridge completed?

(a) 2009

(b) 2017

(c) 2021

(d) 2022

Answer: (c) 2021

Ques: Which organization was responsible for constructing the Chenab Rail Bridge?

(a) Border Roads Organisation

(b) Indian Railways

(c) Konkan Railway Corporation Limited (KRCL)

(d) National Highways Authority of India

Answer: (c) Konkan Railway Corporation Limited (KRCL)

Ques: The Chenab Bridge is taller than which famous world landmark?

(a) Statue of Liberty

(b) Eiffel Tower

(c) Qutub Minar

(d) Golden Gate Bridge

Answer: (b) Eiffel Tower

Ques: What is the lifespan the Chenab Railway Bridge is designed for?

(a) 50 years

(b) 75 years

(c) 100 years

(d) 120 years

Answer: (d) 120 years

Ques: The Chenab Bridge is designed to withstand wind speeds up to?

(a) 150 km/h

(b) 200 km/h

(c) 266 km/h

(d) 300 km/h

Answer: (c) 266 km/h

Ques: What is the maximum speed of trains allowed on the Chenab Railway Bridge?

(a) 50 km/h

(b) 75 km/h

(c) 100 km/h

(d) 125 km/h

Answer: (c) 100 km/h

Ques: How many spans does the Chenab Bridge have?

(a) 10

(b) 15

(c) 17

(d) 20

Answer: (c) 17

Ques: The main arch span length of the Chenab Bridge is?

(a) 350 meters

(b) 467 meters

(c) 500 meters

(d) 600 meters

Answer: (b) 467 meters

Ques: Which project is the Chenab Bridge a part of?

(a) Delhi-Mumbai Industrial Corridor

(b) Udhampur-Srinagar-Baramulla Rail Link

(c) Eastern Dedicated Freight Corridor

(d) Golden Quadrilateral

Answer: (b) Udhampur-Srinagar-Baramulla Rail Link

Ques: What materials are mainly used to construct the Chenab Bridge?

(a) Wood and iron

(b) Concrete and steel

(c) Aluminum and plastic

(d) Brick and stone

Answer: (b) Concrete and steel

Ques: Who inaugurated the Chenab Railway Bridge?

(a) Prime Minister Narendra Modi

(b) President of India

(c) Railway Minister

(d) Defence Minister

Answer: (a) Prime Minister Narendra Modi

Ques: On what date was the Chenab Railway Bridge inaugurated?

(a) 6th June 2025

(b) 15th August 2025

(c) 26th January 2025

(d) 2nd October 2025

Answer: (a) 6th June 2025

Ques: The design of the Chenab Bridge was supported by which Indian institute?

(a) IIT Bombay

(b) IISc Bangalore

(c) NIT Trichy

(d) AIIMS Delhi

Answer: (b) IISc Bangalore

Ques: What safety feature does the Chenab Bridge have in case one of its pillars fails?

(a) The bridge collapses safely

(b) Trains stop immediately

(c) Trains can still run at reduced speed

(d) The bridge is closed indefinitely

Answer: (c) Trains can still run at reduced speed

Ques: The Chenab Bridge is designed to be resistant to what kind of natural disasters?

(a) Hurricanes

(b) Earthquakes

(c) Floods only

(d) Tornadoes

Answer: (b) Earthquakes

Ques: How many engineers approximately worked on the Chenab Bridge?

(a) 500

(b) 1,000

(c) 1,300

(d) 2,000

Answer: (c) 1,300

Ques: The height of the Chenab Bridge is how many meters taller than the Qutub Minar?

(a) 3 times

(b) 5 times

(c) 7 times

(d) 10 times

Answer: (b) 5 times

Ques: What is the approximate cost of constructing the Chenab Railway Bridge?

(a) ₹1,000 crore

(b) ₹1,200 crore

(c) ₹1,486 crore

(d) ₹2,000 crore

Answer: (c) ₹1,486 crore

Ques: The Chenab Bridge is located in which district of Jammu and Kashmir?

(a) Srinagar

(b) Baramulla

(c) Reasi

(d) Anantnag

Answer: (c) Reasi

Ques: What is the purpose of constructing the Chenab Railway Bridge?

(a) Only tourism

(b) Connect remote areas and improve transport

(c) Military only

(d) Agricultural irrigation

Answer: (b) Connect remote areas and improve transport

Ques: Which foreign company collaborated in the construction of the Chenab Bridge?

(a) German Leonhardt Andra and Partners

(b) Japanese Mitsubishi

(c) American Bechtel Group

(d) French Vinci

Answer: (a) German Leonhardt Andra and Partners

Ques: When was the Chenab Bridge project approved?

(a) 1995

(b) 2000

(c) 2003

(d) 2010

Answer: (c) 2003

Ques: Which Indian research institute helped with seismic analysis for the Chenab Bridge?

(a) IIT Delhi

(b) IIT Roorkee

(c) CSIR

(d) Both (a) and (b)

Answer: (d) Both (a) and (b)

Ques: The steel arch of the Chenab Bridge measures approximately how wide?

(a) 5.6 meters

(b) 10.5 meters

(c) 15 meters

(d) 20 meters

Answer: (a) 5.6 meters

Ques: The Chenab Bridge is capable of withstanding explosions equivalent to how many tonnes of TNT?

(a) 10 tonnes

(b) 20 tonnes

(c) 40 tonnes

(d) 60 tonnes

Answer: (c) 40 tonnes

Ques: What is the maximum temperature range the Chenab Bridge can endure?

(a) 0 to 25°C

(b) -10 to 30°C

(c) -20 to 40°C

(d) -50 to 50°C

Answer: (c) -20 to 40°C

Ques: How many deck segments does the Chenab Bridge consist of?

(a) 85

(b) 90

(c) 93

(d) 100

Answer: (c) 93

Ques: Approximate weight of each deck segment on the Chenab Bridge?

(a) 50 tonnes

(b) 70 tonnes

(c) 85 tonnes

(d) 100 tonnes

Answer: (c) 85 tonnes

Ques: What was one major challenge in constructing the Chenab Bridge?

(a) Lack of materials

(b) Remote difficult terrain and logistics

(c) Labor shortage

(d) Invalid design

Answer: (b) Remote difficult terrain and logistics

Ques: Which Indian defense organization was involved in making the bridge blast-proof?

(a) Indian Army

(b) DRDO

(c) BSF

(d) National Disaster Response Force

Answer: (b) DRDO

Ques: The Chenab Railway Bridge lies on which railway route?

(a) Delhi-Mumbai route

(b) Mumbai-Goa route

(c) Udhampur-Srinagar-Baramulla rail link

(d) Kolkata-Patna rail line

Answer: (c) Udhampur-Srinagar-Baramulla rail link

Ques: How long did it take to complete the Chenab Railway Bridge project approximately?

(a) 10 years

(b) 15 years

(c) 22 years

(d) 25 years

Answer: (c) 22 years

Ques: Which feature makes the Chenab Bridge world-famous?

(a) Its unique painting

(b) World's highest railway arch bridge

(c) Its length only

(d) Being a suspension bridge

Answer: (b) World's highest railway arch bridge

Ques: How is the Chenab Bridge significant to India?

(a) Tourism only

(b) Strategic, economic, and connectivity importance

(c) Sports activities

(d) None of the above

Answer: (b) Strategic, economic, and connectivity importance

Ques: Which part of the Chenab Bridge supports the longest span?

(a)deck segment

(b) main arch

(c) pillars

(d) railway tracks

Answer: (b) main arch

Ques: What is the weight of the steel used in the Chenab Bridge?

(a) 10,000 tonnes

(b) 20,000 tonnes

(c) 28,660 mega tonnes

(d) 5,000 tonnes

Answer: (c) 28,660 mega tonnes

Ques: Which technology was key in ensuring the bridge’s seismic stability?

(a) Remote sensing

(b) Seismic isolation bearings

(c) CAT scanners

(d) Heat sensors

Answer: (b) Seismic isolation bearings

Ques: The Chenab Bridge's design allows trains to continue operations even if damaged, how?

(a) By switching to road transport

(b) Rerouting the train

(c) Running trains at slower speed with reduced impact

(d) Halting operations completely

Answer: (c) Running trains at slower speed with reduced impact

Ques: What is the span of the longest arch on the Chenab Bridge compared to other similar bridges globally?

(a) One of the shortest

(b) Longest of its kind in the world

(c) Average span

(d) Smaller than most

Answer: (b) Longest of its kind in the world

Ques: Which German company was involved in the bridge’s arch design?

(a) Siemens

(b) Leonhardt Andra and Partners

(c) Bosch

(d) Liebherr

Answer: (b) Leonhardt Andra and Partners

Ques: The Chenab Bridge is designed to allow trains to run even during what conditions?

(a) Heavy rain only

(b) Earthquakes and strong winds

(c) Snowfall only

(d) All weather except floods

Answer: (b) Earthquakes and strong winds

Ques: Which river is a tributary related to the Chenab River near the bridge area?

(a) Anji River

(b) Beas River

(c) Ravi River

(d) Sutlej River

Answer: (a) Anji River

Ques: The Chenab bridge project involved cooperation between India and which other countries?

(a) USA and China

(b) South Korea and Germany

(c) Russia and France

(d) Japan and UK

Answer: (b) South Korea and Germany

Ques: Which rail company owns the Chenab Rail Bridge?

(a) Indian Railways

(b) Konkan Railway Corporation

(c) South Central Railway

(d) Northern Railway

Answer: (a) Indian Railways

Ques: What is a unique feature of the Chenab Bridge’s structural design?

(a) Arch made from steel boxes filled with concrete for stability

(b) Made of wood and iron

(c) Built over a desert

(d) Flexible but weak structure

Answer: (a) Arch made from steel boxes filled with concrete for stability

course

No courses found

Chenab Railway Bridge FAQs

What is the Chenab Railway Bridge and where is it located?

The Chenab Railway Bridge is a steel and concrete arch bridge built over the Chenab River in Jammu and Kashmir. It is the highest rail bridge in the world.

What is the Chenab Railway Bridge inauguration date?

The Chenab Railway Bridge was inaugurated on June 6, 2025, by Prime Minister Narendra Modi. Regular train traffic started after this opening ceremony.

Why is the Chenab Rail Bridge special?

The bridge is higher than the Eiffel Tower and built to last over 120 years. It can resist strong winds, earthquakes, and even small explosions, making it a true symbol of India’s engineering power.

How much did it cost to build the Chenab Bridge?

The total cost of the Chenab Bridge was about Rs 1,486 crore, and many Indian and international experts worked together on its construction.

What can students learn from this quiz on Chenab Railway Bridge 2025?

This quiz helps students improve Chenab Bridge GK, learn key facts about Indian engineering, and enjoy fun learning through the quiz on Chenab Railway Bridge 2025 with answers.